LinkedIn
Copied!

Table of Contents

Testing connectivity

Save your CTI Link configuration before testing connectivity.
  1. Use Test Connectivity to ensure that the Pega Platform node is connected to the CTI Server using the configured link parameters.

A results screen appears and provides:
  • The name of the CTI Link tested.
  • Connectivity status to the ACD.
  • The PRPC application that will process requests on the local CTI node.
  • The results of the connectivity test.
  • Any error messages that were generated.
Suggest Edit

Have a question? Get answers now.

Visit the Collaboration Center to ask questions, engage in discussions, share ideas, and help others.