Skip to main content

Resolved Issues

View the resolved issues for a specific Platform release.

Go to download resolved issues by patch release.

Browse release notes for a selected Pega Version.

NOTE: Enter just the Case ID number (SR or INC) in order to find the associated Support Request.

Please note: beginning with the Pega Platform 8.7.4 Patch, the Resolved Issues have moved to the Support Center.

INC-130304 · Issue 567925

Retry logic added for downloading upgraded rules

Resolved in Pega Version 8.2.8

A Rules upgrade failed while downloading applications from the maintenance server due to an SFTP server connection failure. This has been resolved by adding logic to retry if the first connection attempt fails.

INC-132218 · Issue 573358

Resolved buffer overflow for Migration loadDatabase

Resolved in Pega Version 8.2.8

A Rules upgrade failed in the Migration step at loadDatabase stage, involving the move of all the table records from old schema to new schema. This was traced to the inability of Migration to load blob of sizes more than 100 MB, and has been resolved by updating Migration to use byte[] to read the blob content with the help of metadata that contains blob length.

INC-133202 · Issue 574700

TableRenameUtil hashing improved

Resolved in Pega Version 8.2.8

During index name generation, the algorithm that was responsible for index name uniqueness was sometimes insufficient and cerated a loop condition. This has been resolved by using a stronger hash algorithm and refactoring the code that could result in a loop.

SR-D48396 · Issue 520424

Hazelcast upgraded to resolve node startup issue

Resolved in Pega Version 8.1.8

Post data upgrade, the ADM tier failed to start and the error "java.lang.IllegalStateException: Node failed to start!" appeared. This was traced to a dormant bug in Hazelcast 3.11 that caused starting nodes to fail when the Hazelcast master node was shutting down, which was exposed by recent Pega changes made to enable parallel restarts of nodes in Cloud environments. Hazelcast delivered a fix for the parallel restart problem and the hotfixed jar has been merged into the platform.

SR-D52249 · Issue 515703

Resolved Oracle thread deadlock for Merge SQL

Resolved in Pega Version 8.1.8

After starting a large cluster and running it for a couple of days, Oracle Deadlocks started to appear due to resource contention during MERGE SQL execution on the PR_INDEX_REFERENCE database table. The "ORA-00060: deadlock detected while waiting for resource" ERROR occur continuously every 10 minutes during the "MasterForNewAgents" Daemon run. All JVMs are impacted by the ERROR/Deadlock. Investigation showed that even though the identified / problematic Data-Agent_queue instances were disabled for PegaAESRemote, the MERGE SQLs continued to fire. To resolve this, an update has been made so the system will skip the copy of rule reference property from RAQ, while creating DAQ.

SR-D55160 · Issue 520356

Namibia and Botswana added to Currency Symbol values

Resolved in Pega Version 8.1.8

Support has been added for the Namibia (en_NA) and Botswana (en_BW) locales in the default Currency Symbol values.

SR-D56527 · Issue 538302

DSS PegaAESREmote*ResetTableStats set to false

Resolved in Pega Version 8.1.8

In order to prevent an issue with resetting table stats that potentially impacts postgres in an unintended fashion, the DSS PegaAESREmote*ResetTableStats has been set to false.

SR-D57038 · Issue 519381

JobScheduler DST handling updated

Resolved in Pega Version 8.1.8

When the locale being used changed out of Daylight Savings Time, scheduled jobs did run at the same local time as before but instead ran an hour earlier than expected. Investigation showed that jobscheduler calculated the next runtime based on the time difference from the cluster reference time and current time in milliseconds, and this offset in milliseconds was added to next run time. Since the cluster was started in DST, the job was running on same time due to the time difference. To resolve this, the system will use a calculation offset and set hours/minutes to nextRunTime object so that calendar lib handles daylight savings.

SR-D58927 · Issue 522289

Added expiration for orphaned tracers

Resolved in Pega Version 8.1.8

After tracing a REST service, the tracer was persisting but not showing in the requestor list from Admin studio. The operator shown in the error did not have access to the system anymore, and other users were not able to trace the service rule. Trying to clear the requestors in all the nodes using API POST /nodes/{nodeID}/pools/requestor/clear also did not resolve the issue. To address this, a distributed rule watch expiration has been added.

SR-D83192 · Issue 545056

JobScheduler DST handling updated

Resolved in Pega Version 8.1.8

When the locale being used changed out of Daylight Savings Time, scheduled jobs did run at the same local time as before but instead ran an hour earlier than expected. Investigation showed that jobscheduler calculated the next runtime based on the time difference from the cluster reference time and current time in milliseconds, and this offset in milliseconds was added to next run time. Since the cluster was started in DST, the job was running on same time due to the time difference. To resolve this, the system will use a calculation offset and set hours/minutes to nextRunTime object so that calendar lib handles daylight savings.

We'd prefer it if you saw us at our best.

Pega.com is not optimized for Internet Explorer. For the optimal experience, please use:

Close Deprecation Notice
Contact us