| 
                    
Click the Breakpoint button
to access the Breakpoint Configuration form. You can set breakpoints for specific steps in activities.
                
To set breakpoints in an activity:
at entry or 1 to break when the activity starts. To break for each step, choose all steps.When a breakpoint is set for the activity, when you (or the selected requestor connection) starts this activity, the Tracer window acquires focus.
To resume processing after a break, click Continue 
 in the Tracer.
                
If you don't resume processing for an hour after a break, processing resumes automatically.
                
You can't review the clipboard when processing has reached a breakpoint, as the requestor being traced is paused.
To remove a set breakpoint, in the Breakpoint Configuration form, check the Remove box and click Remove .