You are here: Case management > Modeling advanced processes > Adding an advanced shape to a flow > Configuring a Run Interaction shape

Configuring a Run Interaction shape

The Run interaction shape references an Interaction that runs on another page available through Pages & Classes or on the current work item. The shape's operation is driven by the way the interaction rule is configured to run the strategy.

In the process of designing the process flow, you typically use two interaction rules:

It is available in applications that have access to the Decision Management rule sets or in applications built on PegaDM.
  1. Double-click the Run Interaction shape.

  2. Complete the fields in the property panel as described in the following table.

  3. Click OK to close the property panel.

  4. Hover on an existing shape in the flow and drag a connector from it to the Run Interaction shape.

  5. Hover on the Run Interaction shape and drag a connector to an existing shape in the flow.

Tip: Right-click a Run Interaction shape to view more configuration options.

Related Topics Link IconRelated information