Show all
Click the Where-am-I? icon (
) on a worklist
or the equivalent Where-am-I? button (
)
on a work object form to view, in a separate window, the Visio
diagram of the current flow rule, with a larger arrow marking
the current assignment.
This display shows the stack of
one or more incomplete flow executions in progress that lead to
a specific assignment or other incomplete task. It does
not show the entire work object history, which may
involve other flow executions now completed.
Only users who hold the
Work-.Perform privilege can display and interact
with the diagram.
If your application is localized, the labels on this display are localized (when displayed from a WorkManager or WorkUser portal).
Basics
This window has three panels:
- The top panel contains one or more flow names,
identifying the current flow execution in progress and
parent flows. Completed flows and parallel in-process flows
do not appear.
- The left panel contains an image of one flow rule (in
Visio diagram form), with a golden arrow marking the
current assignment or task.
- The right panel contains selected details from the
history of this work object.
Top panel
The top panel presents flows in the current flow stack.
The flowstack is the current list of flow
rules in process for a current task. It does not include
completed flow executions, or other executions operating on
this work object in parallel to the current execution.
The flow at the top left was started first, and in most
cases is the flow that created the work object. Each flow is
the parent of the next subflow presented. The flow at the
bottom left is the subflow that contains an incomplete
assignment.
Click a flow name to select it and view details in the
left and right panels. The selected flow name has a
Yellow
background.
Left panel
The left panel contains an image of the Visio diagram for
the flow selected.
A golden arrow (
) identifies the current shape,
typically an assignment.
Click the Show All Steps button if visible to mark
each complete assignment plus the current assignment with a yellow check mark. Click Hide All Steps to hide these check marks.
Click Open Flow to open the flow rule in the main portal window. (This button is visible only when the Where-Am-I? display is opened from the Developer portal.)
Right panel
The right panel displays selected items from the history
of the work object, for the flow that is selected (and marked with a
Yellow
background) in the top panel.
For assignment shapes, the display includes:
- The date and time the assignment was created (or that
the router task was executed, if a router task is
associated with the assignment)
- The operator who performed the assignment
- The connector flow action that completed the
assignment
- The date and time the assignment was completed.
For other shapes, the contents of the right panel depend
on history options in the flow rule.
User portal basics